Earthwork Tips

  • Strip site of all vegetation including grass.
  • Fill stump holes with compacted fill.
  • Level site by means of Cut and/or Fill, always level site larger than the actual slab size (preferably 1000mm larger on all sides).
  • Where fill is used to achieve level site be sure to spread fill layers of approx. 150mm and “wheel roll” each layer for compaction.
  • Make sure to use fill material that is “compactable”.
  • Note: Wheeled equipment will compact fill better than tracked equipment.

Oz-Cover will assist you every step of the way with the planning and preparation ensuring all building and council requirements have been met. You will be provided with:

  • Options from a large range of standardised and customised designs
  • Information regarding council requirements
  • Preliminary budget costings
  • At your request, written quotation complete with sketch plan

oz cover

Before you consider building - there are some things to consider. What are the:

  • Needs of your building for present use?
  • Needs for future use?
  • Needs for functionality?
  • Needs for Aesthetics?
  • Needs for Return Value on Investment?
  • Need help?